INDUSTRIAL COMPLEX
ArticleName
First stage of mastering of Grib deposit: preparatory and capital mining operations
ArticleAuthors
Zaostrovtsev V. N., Yaparov Ya. A., Klimenko Yu. A., Nalivayko V. A.
ArticleAuthorsData
Arkhangelskgeoldobycha:
Zaostrovtsev V. N., Deputy general director — Chief Engineer (since 15 December 2008 till 30 June 2014), e-mail: VZaostrovtsev@agd.lukoil.com
Yaparov Ya. A., Head of Production and Technical Department, e-mail: Yaparov@agd.lukoil.com
Klimenko Yu. A., Mining Engineer, e-mail: YKlimenko@agd.lukoil.com
Nalivayko V. A., Chief Project Engineer, e-mail: vnalivayko@giproruda.ru
Abstract
The article describes the scheme of the deposit opening as well as the structure, technology and equipment of stone drivages aimed at removal of thick overburden layer as the first stage of the diamond deposit development at commercial level.
keywords
diamond deposit, open-pit mine, ore body, overburden rock, opening-up, preparatory work
Language of full-text
english
Full content