ArticleName |
Substantiation of efficient parameters for hybrid open pit/underground mining of coal |
ArticleAuthorData |
Geotekhnologia Research and Technology Center, Chelyabinsk, Russia:
V. A. Pikalov, Head of a department, Doctor of Engineering Sciences, pikalov@ustup.ru A. V. Sokolovsky, Chairman of the Board of Directors, Doctor of Engineering Sciences
SUEK-Kuzbass Company, Leninsk-Kuznetsky, Russia: V. N. Vasilets, Principal Engineer, Open Pit Mine Management
Magnitogorsk State Technical University, Magnitogorsk, Russia: K. V. Burmistrov, Assistant Professor, Candidate of Engineering Sciences |
Abstract |
The article describes a procedure of determining efficient interrelated parameters of hybrid open pit/underground coal mining to ensure mine safety enhancement and coal production increment at the concurrent operation of open pit and underground mines in complicated deeper level geological and mining conditions. It has been found that as against sequential transition from open pit to underground mining, concurrent hybrid mining is complicated by negative cross-influence of the methods. The basic negative factors of the concurrent hybrid open pit and underground mining is seismic effect of large-scale blasts in open pit onto stability of underground excavations and generation of a subsidence trough, which initiates such hazardous geomechanical events as cracks, funnels, sinks and horizontal displacements in open pit. The hybrid coal mining flow sheets are classified based on the criterion of position and advance of the open pit and underground mining fronts relative to each other; the mathematical calculations based on these classifications are built-up for: geomechanically safe spacing of production faces in open pit and underground mines; rate of approach of open pit and underground mining fronts for various orientations of the fronts; parameters of suspending open pit mine sections on approach of the open pit and underground mining fronts and duration of the period of suspension conditions and time for a suspended section to reach the normal operating conditions after resumption of work. For estimation of production conditions in hybrid open pit/underground mines, it is suggested to use the work mix coefficient as the product of the suspended mining front length and the suspension time. In this case, the production is optimized due to withdrawal of the suspended mining front length and the suspension time, i.e. the target function of short-term and long-term mine planning is reaching zero value of the work mix coefficient.
The authors appreciate contribution of V. Yu. Zalyadnov, Candidate of Engineering Sciences, Assistant Professor at the Open Pit Mineral Mining Department, Magnitogorsk State Technical University. |
References |
1. Los I. N. Nauchnye osnovy kombinirovannoy razrabotki ugolnykh mestorozhdeniy Severa (Scientific basis of combined mining of coal deposits of the North). Novosibirsk : Nauka, 1991. 149 p. 2. Shakhty ugolnykh razrezov – sovremennaya tendentsiya razvitiya kombinirovannoy (otkryto-podzemnoy) tekhnologii osvoeniya ugolnykh mestorozhdeniy Kuzbassa: innovatsionnyy proekt (Coal cut mines – the modern trend of development of combined (open-cast-underground) technology of Kuzbass coal deposits' mastering: investment project). Novosibirsk : Institute of Coal of the Siberian Branch of Russian Academy of Sciences, Institute «Giprougol», 2011. (in Russian) 3. Shchelkanov V. A. Kombinirovannaya razrabotka rudnykh mestorozhdeniy (Combined mining of ore deposits). Moscow : Nedra, 1974. 232 p. 4. Mukhtarov T. M. Kombinirovannyy sposob razrabotki mestorozhdeniy (Combined method of deposit mining). Moscow : Nauka, 1988. 231 p. 5. Kazikaev D. M. Kombinirovannaya razrabotka rudnykh mestorozhdeniy (Combined mining of ore deposits). Moscow : Gornaya kniga, 2008. 360 p. 6. Kaplunov D. R., Rylnikova M. V. Kombinirovannaya razrabotka rudnykh mestorozhdeniy (Combined mining of ore deposits). Moscow : Gornaya kniga, 2012. 344 p. 7. Chernykh A. D., Andreev B. N., Oshmyanskiy I. B. Otkryto-podzemnaya razrabotka rudnykh mestorozhdeniy (Open-cast-underground mining of ore deposits). Krivoy Rog : Tekhnika, UB-kniga, 2010. 520 p. 8. Knissel W., Schmid M., Mischo H. Australien’99 — Steinkohlengewinnung im Tiefbau, Tagebau und Endböschungsbergbau. Russische Ausgabe der Zeitschrift Glückauf. Mining Report Gluckauf. 2001. No. 1. pp. 55–59. 9. Chen J., Gu D., Li J. Optimization principle of combined surface and underground mining and its applications. Journal of Central South University of Technology. 2003. Vol. 10, No. 3. pp. 222–225. 10. Bakhtavar E., Shahriar K. Optimal ultimate pit depth considering an underground alternative. Proceedings of Fourth AACHEN International Mining Symposia-High Performance Mine Production, Aachen, Germany, 2007. pp. 213–221. 11. Bakhtavar E., Shahriar K., Oraee K. A model for determining optimal transition depth over from open-pit to underground mining. Proceedings of the 5th International Conference on Mass Mining. 2008. pp. 393-400. 12. Coal Production and Processing Technology, edited M. R. Riazi, Rajender Gupta. Taylor&Francis Group, LLC, 2016. p. 535 13. Gavrishev S. E., Burmistrov K. V., Kolonyuk A. A. Intensivnost formirovaniya rabochey zony glubokikh karerov (Intensity of formation of the working area of deep pits). Magnitogorsk : Magnitogorsk State Technical University, 2012. 189 p. 14. Tsyganov A. V., Osintsev N. A., Burmistrov K. V., Kolonyuk A. A., Zalyadnov V. Yu. Printsipy upravleniya bezopasnostyu proizvodstva pri sovershenstvovanii tekhnologicheskikh skhem karerov (Principles of production safety management during the improvement of technological schemes of open pits). Problemy povysheniya ekologicheskoy i promyshlennoy bezopasnosti proizvodstvenno-tekhnicheskikh kompleksov promyshlennykh regionov : sbornik nauchykh trudov (Problems of increasing of ecological and industrial safety of production-technical complexes of industrial regions : collection of scientific proceedings). Magnitogorsk : Magnitogorsk State Technical University, 2004. pp. 66–68. 15. S. A. Kozyrev, A. V. Sokolov, V. Yu. Zaporozhets. Seysmicheskoe vozdeystvie massovykh vzryvov v karere na podzemnye gornye vyrabotki (Seismic influence of large-scale blasts in open pit on underground workings). Gornyi Zhurnal = Mining Journal. 2010. No. 9. pp. 28–31. 16. Fedorin V. A., Mikhaylov A. Yu., Ivershina G. E. Geotekhnologicheskie aspekty otkrytopodzemnogo (sovmeshchennogo) sposoba osvoeniya ugolnykh mestorozhdeniy Kuzbassa (Geotechnological aspects of open-cast-underground (combined) method of mastering of Kuzbass coal deposits). Gornyy informatsionno-analiticheskiy byulleten = Mining informational-analytical bulletin. 2008. No. 11. pp. 261–269. 17. Pleskunov V. N., Shvab R. G., Pleskunov I. V. Otsenka osnovnykh gorno-geologicheskikh faktorov pri sovmestnoy otkryto-podzemnoy razrabotke svity ugolnykh plastov (Estimation of basic mining-geological factors in the time of joint open-castunderground mining of coal series). Gornyi Zhurnal = Mining Journal. 2014. No. 2. pp. 71– 76. 18. Zhou D., Tan Z. Y., Huang Z. J., Xie Z. Q. Analysis of safety effect on explosive in loaded cavern under the surface blasting. Transit Development in Rock Mechanics — Recognition, Thinking and Innovation : Proceedings of the 3RD ISRM young scholars' symposium on rock mechanics. XI'AN, CHINA. 8–10 November, 2014. pp. 663–668. 19. H. Peng, Qingxiang Cai, Li Ma, Wenliang Tang. End-wall Slope Stability Analysis of Surface Coal Mine under the Combined Open-pit Mining with Underground Mining. EJGE. 2014. Vol. 19, Bund. А. pp. 185–194. 20. Wang N., Wan B. H., Zhang P., Du X. L. Analysis on deformation development of openpit slope under the influence of underground mining. Legislation, Technology and Practice of Mine Land Reclamation : Proceedings of the Beijing International Symposium on Land Reclamation and Ecological Restoration (LRER 2014), Beijing, China. London : Taylor & Francis Group, 2015. pp. 53–59. 21. Marino G. G., Posluszny G. Progressive Mine Instability and Subsidence Response: A Case Study. EJGE. 2015. Vol. 20, Bund. 12. pp. 5115–5131. |