Журналы →  Gornyi Zhurnal →  2016 →  №7 →  Назад

FROM THE OPERATIONAL EXPERIENCE OF THE MINING COMPANIES AND THE ORGANIZATIONS
MINE «KOMSOMOLSKY»
Название Pre-stoping assessment of stress state of ore body S-2 in Skalistaya Mine
DOI 10.17580/gzh.2016.07.02
Автор Galaov R. B., Kisel A. A., Andreev A. A., Zubkov V. V.
Информация об авторе

Polar Division, Norilsk Nickel, Norilsk, Russia:

R. B. Galaov, Deputy Director in Mineral-Raw Materials Management, andreevaiv@tf.nk.nornik.ru
A. A. Kisel, Head of Geodynamic Safety Department

 

VNIMI, Saint-Petersburg, Russia:
A. A. Andreev, Head of Norilsk Sector
V. V. Zubkov, Chief Researcher, Doctor of Engineering Sciences

Реферат

Skalistaya mine field lies northwards Komsomoslky mine fi eld and is a part of the Talnakh copper-nickel sulfide ore deposit. Geomechanics of enclosing rock mass of ore body S-2 is governed by adjacency of Norilsk-Kharaelakh fault and sub-parallel dip-slips, sub-meridional strike-and-dip slips and reverse faults, is characterized by steep dip angles of these dislocations and conditions considerable level of damage and, thus, low stability of ore body and enclosing rocks. Moreover, S-2 ore body is rockbursthazardous; for this reason, mining safety requires a package of rockburst prediction and prevention measures, and stoping is carried out in safety zones due to relaxation drilling. Aimed at efficient rockburst prevention planning, a ring of core holes was dilled from development drives in order to define stress tensor of initial rock mass unaffected by stoping. The borehole data were used to ensure safety of primary cutting. Considering predominant horizontal stresses oriented across stoping axis, after driving a stope drift, it was recommended to implement local rockburst-hazard prediction based on core disking and drilling data in the drift roof per each 20 m of blasting. Stress assessment showed nonhazardous level of stresses, and no special actions to prevent from rockbursting were required. As stoping was advanced, stresses in ore body under mining were assessed by mathematical modeling using SUIT3D. The modeling yielded that at the early stage of S-2 ore body mining, increased rock pressure zone was to extend up to 5 m around the stoping while stresses reached the value of 1.4γН. At this stage of mining, visual and instrumental (geophysical and geomechanical) monitoring of rock pressure near S-2 ore body showed no rock pressure events in advanced development drives with the undercut span 78 m long, and stresses were under 0.55 of uniaxial compression limit of ore, which was nonhazardous category of rockburst hazard rating.

Ключевые слова Stress state, stress tensor, core hole drilling, mathematical modeling, rockburst hazard category, ore body cutting, increased rock pressure zone
Библиографический список

1. Proekt «Rudnik «Skalistyy». Pervaya ochered. Korrektirovka» (Project "Skalisty mine. First order. Correction"). Norilsk : Norilskproekt, 2004. (in Russian)
2. Available at: http://tke.ru/news/ntd/1397539049/ (in Russian)
3. Ukazaniya po bezopasnomu vedeniyu rabot na Talnakhskom i Oktyabrskom mestorozhdeniyakh, sklonnykh i opasnykh po gornym udaram (Regulations for safe mining operations at Talnakh and Oktyabrskoe deposits, inclined and prone to rock-bumps). Norilsk, Saint Petersburg, 2015. 88 p. (in Russian)

4. Borshch-Kompaniets V. I., Makarov A. B. Gornoe davlenie pri otrabotke moshchnykh pologikh rudnykh zalezhey (Rock pressure during thick fl at ore deposits mining). Moscow : Nedra, 1986. 271 p.
5. Kuranov A. D. Primenenie chislennogo modelirovaniya dlya vybora bezopasnykh parametrov sistem razrabotki rudnykh mestorozhdeniy v vysokonapryazhennykh massivakh (Application of numerical modeling for the choice of safe parameters of ore deposit mining systems in highstressed massifs). Zapiski Gornogo instituta = Proceedings of the Mining Institute. 2013. Vol. 206. pp. 60–64.
6. Gornaya geomekhanika i marksheyderskoe delo: sbornik nauchnykh trudov (Mining geomechanics and mine surveying: collection of scientific proceedings). Saint Petersburg : Research Institute of Mining Geomechanics and Mine Surveying, 1999. 496 p. (in Russian)
7. Petukhov I. M., Linkov A. M. Mekhanika gornykh udarov i vybrosov (Mechanic of rock bumps and discharges). Moscow : Nedra, 1983. 279 p.
8. Sokolov I. V., Antipin Yu. G. Sistematizatsiya i ekonomiko-matematicheskoe modelirovanie variantov vskrytiya podzemnykh zapasov pri kombinirovannoy razrabotke mestorozhdeniy (Systematization and economic-mathematical modeling of methods of underground reserves opening during the combined deposit mining). Gornyi Zhurnal = Mining Journal. 2012. No. 1. pp. 67–71.
9. Wang Yi-Zhuang, Li Xiao-Zhao, Zhang Yans-Song, Zhao-Bao, Yuan Liang, Cheng Jin-Yuan. Fangzai jianzai gongcheng xuebao. International Journal of Disaster Risk Reduction. 2011. No. 4. pp. 441– 449.
10. Stefanov Yu. P., Chertov M. A., Aidagulov G. R., Myashikov A. V. Dynamics of inelastic deformation of porous rocrs and formation of localized compaction zones studied by numerical modeling. Journal of the Mechanics and Physics of Solids. 2011. Vol. 59, No. 11.
11. Wang N., Wan B. H., Zhang P., Du X. L. Analysis on deformation development of open-pit slope under the influence of underground mining. Proceedings of International Symposium on Land Reclamation and Ecological Restoration. Beijing, China, 2015. pp. 53–58.
12. Wang D. S., Chang J. P., Yin Z. M., Lu Y. G. Deformation and failure characteristics of high and steep slope and the impact of underground mining. Transit Development in Rock Mechanics-Recognition, Thinking and Innovation : Proceedings of the 3rd ISRM Young Scholars Symposium on Rock Mechanics. USA, 2014. pp. 451–457.
13. Karelin V. N., Marysyuk V. P., Nagovitsin Yu. N., Vilchinskiy V. B. Issledovanie geomekhanicheskogo sostoyaniya rudoporodnogo massiva v pole rudnika «Skalistyy» (Investigation of geomechanical state of ore-rock massif in the Skalisty mine field). Gornyi Zhurnal = Mining Journal. 2010. No. 6. pp. 63–65.
14. Galaov R. B., Zvezdkin V. A., Shabarov A. N. Geomekhanicheskoe obosnovanie bezopasnykh sposobov razrabotki tektonicheski napryazhennykh blokovykh struktur rudnykh zalezhey Talnakhskogo uzla (Geomechanical substantiation of safe methods of development of tectonically stressed block structures of Talnakh cluster ore deposits). Gornyi Zhurnal = Mining Journal. 2013. No. 12. pp. 17–21.
15. Ter-Martirosyan A. Z., Mirnyy A. Yu., Sidorov V. V., Sobolev E. S. Opredelenie parametrov modeli Hardening Soil po rezultatam laboratornykh ispytaniy (Definition of Hardening Soil model parameters according to the results of laboratory investigations). Geotekhnika. Teoriya i praktika: obshcherossiyskaya konferentsiya molodykh uchenykh, nauchnykh rabotnikov i spetsialistov: mezhvuzovskiy tematicheskiy sbornik trudov (Geotechnics. Theory and practice: All-Russian conference of young scientists, researches and specialists: inter-university thematic collection of proceedings). Saint Petersburg : Saint-Petersburg State University of Architecture and Civil Engineering, 2013. pp. 141–146.
16. Olovyannyy A. G. Gravitatsionnyy bokovoy raspor i tektonicheskie napryazheniya v massive gornykh porod (Gravitation horizontal stress and tectonic stresses in rock massif). Marksheyderskiy Vestnik = Mine Surveying Bulletin. 2011. No. 3. pp. 40–46.

Полный текст статьи Pre-stoping assessment of stress state of ore body S-2 in Skalistaya Mine
Назад