Журналы →  Gornyi Zhurnal →  2016 →  №7 →  Назад

URALGIPRORUDA INSTITUTE
Название Hoist units for shafts to access deep levels in modern underground mines
DOI 10.17580/gzh.2016.07.15
Автор Merkuriev N. N.
Информация об авторе

Uralgiproruda Institute, Ekaterinburg, Russia:

N. N. Merkuriev, Chief Specialist of Mining and Mechanics Sector, mail@ugruda.ru

Реферат

The article describes the approaches developed by the Uralgiproruda Institute to get access to deep levels in modern underground mines using vertical shafts equipped by hoist units using examples of a skip-and-cage shaft and a skip shaft currently under construction in Cheremukhovskaya-Glubokaya mine of Sevuralboksitruda and in Udachny mine of ALROSA, respectively. The scope of the description embraces history of design, construction and equipment of the shafts, their characteristics and features of derricks, as well as construction and equipment of the latter. Programs and software packages used in planning and design of unstandardized equipment are mentioned. The author gives examples of the Institute projects on optimizing processes (lowering/lifting of people, ore and rock drawing by one hoist in Cheremukhovskaya-Glubokaya mine) and improving energy efficiency of a set of hoists (use of heat loss of electrics of hoisting machines to heat derrick in winter time). Toward higher energy efficiency of the set of hoists, the both projects addressed the same solution on using heat loss of process equipment (electric drives of hoisting machines and variable speed drives) for warming of the enclosed area of the derrick in cold season. With this end in view, it was provided that the system of ventilation of the process equipment was connected with the system of ventilation of the derrick, and a system of automation and control of this coupling depending on temperature outside and inside the derrick was developed. Such solution favored enhanced efficiency of the whole set and allowed reduction in heating cost, which is an issue of concern given the climate of the mine location.

Ключевые слова Uralgiproruda Institute, mineral mining, mineral accessing, mine shaft, mine hoist, multicable hoisting machines, tower-type derrick, unstandardized equipment, skip, cage, stepping formwork
Библиографический список

1. Federalnye normy i pravila v oblasti promyshlennoy bezopasnosti «Pravila bezopasnosti v ugolnykh shakhtakh» (Federal rules and regulations in the area of industrial safety “Safety rules in coal mines”). Moscow : JSC “Scientific-Engineering Center of Investigations of industrial safety problems”, 2014. Series 05, Iss. 40. 200 p. (in Russian)
2. Federalnye normy i pravila v oblasti promyshlennoy bezopasnosti «Pravila bezopasnosti v ugolnykh shakhtakh» (Federal rules and regulations in the area of industrial safety “Safety rules in coal mines”). Moscow : JSC “Scientific-Engineering Center of Investigations of industrial safety problems”, 2014. Series 03, Iss. 78. 276 p. (in Russian)
3. Pyrkov V. I., Chebkasova S. B. Rekonstruktsiya deystvuyushchikh i proektirovanie novykh shakhtnykh podemnykh ustanovok (Reconstruction of working mine hoisting plants and design of new ones). Gornyi Zhurnal = Mining Journal. 2011. No. 7. pp. 22–25.
4. Menendez E., Matschei T., Glasser F. P. Sulfate attack of concrete. Performance of Cement-Based Materials in Aggressive Aqueous Environments. RILEM State-ofthe-Art Reports 10, 2013.
5. Ilin S. R., Ilina S. S., Samusya V. I. Mekhanika shakhtnogo podema (Mine hoisting mechanics). Dnepropetrovsk : National Mining University, 2014. 247 p.
6. Thanga Raj C. Particle swarm and fuzzy logic based optimal energy control of induction motor for a mine hoist load diagram. IAENG International Journal of Computer Science. 2009. Vol. 36, No. 1. pp. 17–25.
7. Petrochenkov A. B. An information of industrial electrotechnical complexes. Russian Electrical Engineering. 2015. Vol. 86, No. 6. pp. 692–696.
8. Malinovskiy A. K. Sovershenstvovanie sistemy tormozheniya shakhtnykh podemnykh mashin (Improvement of the braking system of mine hoisting plants). Gornyi Zhurnal = Mining Journal. 2009. No. 10. pp. 88–89.
9. Kaledin O. S. Innovatsionnye tekhnologii stroitelstva sverkhglubokikh shakhtnykh stvolov (Innovative construction technology of ultra deep shafts). Gornyi Zhurnal = Mining Journal. 2014. No. 4. pp. 77–81.
10. Ilbuldin D. Kh., Stepanov G. M. Energosberezhenie v usloviyakh perekhoda aktsionernoy kompanii «ALROSA» na podzemnyy sposob otrabotki mestorozhdeniy (Energy-Saving Under Conditions of Alrosa OJSC Transition to Underground Method of Deposit Development). Vestnik Irkutskogo Gosudarstvennogo Tekhnicheskogo Universiteta = Bulletin of Irkutsk State Technical University. 2015. No. 6. pp. 52–56.
11. Douzhang D., Bin P. Technical design of a series gantry planer main driving system based on Siemens M4 controller. Journal of Shanghai Dianji University. 2009-03.
12. Ding L., Zhou Y., Akinci B. Building information modeling (BIM) application framework: the process of expanding from 3D to computable. Automation in Construction. 2014. No. 46. pp. 82–93.

Полный текст статьи Hoist units for shafts to access deep levels in modern underground mines
Назад