Журналы →  Gornyi Zhurnal →  2017 →  №5 →  Назад

PRODUCTION SYSTEM AT LEBEDINSKY GOK
Название Crushed stone production at Lebedinsky GOK
DOI 10.17580/gzh.2017.05.10
Автор Mikhailov A. P., Strizhebokov S. V., Ushakova E. V.
Информация об авторе

JSC Lebedinsky GOK, Gubkin, Russia:

A. P. Mikhailov, Head of Grinding-and-Sorting Factory, strizhebokov_s_v@lebgok.ru
S. V. Strizhebokov, Chief Engineer of Grinding-and-Sorting Factory
E. V. Ushakova, Leading Specialist of Technical Department

Реферат

The grinding-and-sorting factory of Lebedinsky GOK (Mining and Proocessing Plant) is the largest producer of crushed stone in central Russia. Since 1989 up to this day, the factory has produced more than 90 Mt of high-quality crushed stone for road making and construction. The factory’s customers are plants located in the Belgorod, Kursk and Orel Regions, as well as the production units of Lebedinsky GOK. The factory includes: a grinding-and-sorting installation for processing of crystalline schist from nearcontact zones (annual capacity 1380 thou t); a mobile grinding-and sorting plant to process crystalline schist and quartzitic sandstone (annual capacity 1760 thou t); a fixed automated quartzitic sandstone processing line (annual capacity 960 thou t); raw material reception and finished product shipment sections. The feedstock in the form of by-produced rocks is delivered from an open pit mine by process-specifi c trains to the factory’s intermediate stores wherefrom it is loaded in BelAZ dump trucks by shovels EKG-6.3 US and transported to receiving bunkers at processing lines. The end products are shipped in motor and rail transport by shovels EKG-4.6(5A) and front-end loaders. The feedstock and end product quality inspection is implemented by the Engineering Control Board of Lebedinsky GOK. The grinding-and-sorting factory successively expands, promptly responds to the call of the building material market and the needs of the GOK in terms of the crushed stone products, intakes new types of overburden rocks into production and takes a well-deserved place in the field of the integrated subsoil use.

Ключевые слова Crushed stone, grinding-and-sorting factory, crystalline schist, quartzitic sandstone, crushed stone production
Библиографический список

1. Kaplunov D. R., Rylnikova M. V., Radchenko D. N. Expansion of raw materials base of mining enterprises on the basis of complex usage of mineral resources of deposits. Gornyi Zhurnal. 2013. No. 12. pp. 29–32.
2. Ilin Kh. A., Kovalenko V. S., Pastikhin D. V. The overcoming of the open cut mining initial disadvantages: experience and results. Gornyi Zhurnal. 2012. No. 4. pp. 25–32.
3. Fomin S. I., Feul A. A. The ecological negative influence reduction ways on mining regions. Zapiski Gornogo instituta. 2013. Vol. 203. pp. 215–219.
4. Perti R., Stein W., Dahmen D., Buschhüt K. Sustainable follow-up use of recultivated surfaces. World of Mining – Surface & Underground. 2013. Vol. 65, No. 2. pp. 92–101.
5. Gilberthorpe E., Papyrakis E. The resource curse at the micro, meso and macro levels. Extractive Industries and Society. 2015. Vol. 2(2). pp. 381–390.
6. Costanza R. A theory of socio-ecological system change. Journal of Bioeconomics. 2014. Vol. 16(1). pp. 39–44.
7. Farley J., Costanza R., Flomenhoft G., Kirk D. The Vermont common assets trust: an institution for sustainable, just and efficient resource allocation. Ecological Economics. 2015. Vol. 109. pp. 71–79.
8. Costanza R., Fioramonti L., Kubiszewski I. The UN sustainable development goals and the dynamics of well-being. Frontiers in Ecology and the Environment. 2016. Vol. 14. 59 p.
9. Petrosyants V. Z., Dokholyan S. V. Conceptual fundamentals of the strategy of regional development. Regionalnye problemy preobrazovaniya ekonomiki. 2011. No. 3. pp. 17–23.
10. Available at: http://docs.cntd.ru/document/469024181 (accessed: 21.02.2017).
11. Khrisanov V. A. Geoecological assessment of the influence of mining of non-metallic minerals on environment (on the example of Belgorod oblast). Anthropogenic geomorphology – science and practice : materials of the XXXII Plenum of Geomorphological Committee RAS. Belgorod, 2012. pp. 368–370.
12. Shlain I. B. Mining of non-metallic raw materials deposits. Moscow : Nedra, 1985. 344 p.
13. Chaus K. V. et al. Technology of production of construction materials, products and constructions: tutorial for universities. Moscow : Stroyizdat, 1988. 488 p.
14. Absatarov S. Kh., Loktionov S. V., Fedorovskiy Yu. A. Broken stone production from overburden rocks at Lebedinsky GOK. Gornyi Zhurnal. 2007. No. 7. pp. 56–58.
15. Construction materials: reference book. Ed.: A. S. Boldyrev, P. P. Zolotov. Moscow : Stroyizdat, 1989. 567 p.
16. Geological report about recalculation of ferruginous quartzite reserves and exploration of overburden rocks of Lebedinskoe deposit of Staryy Oskol iron ore region of Kursk Magnetic Anomaly as of 01.01.1984. (Gubkin region of Belgorod oblast). Volume II. Exploration of overburden rocks. Book 1. Overburden formation. Belgorod, 1984. 192 p.
17. State Standard GOST 8267-93. Crushed stone and gravel of solid rocks for construction works. Specifications. 12 p.
18. State Standard GOST 25607-2009. Crushed stone-sandy mixtures for road and airfield surfacings and bases. Specifi cations. 12 p.

Полный текст статьи Crushed stone production at Lebedinsky GOK
Назад