Журналы →  Gornyi Zhurnal →  2018 →  №1 →  Назад

THEORY AND PRACTICE OF PRODUCTION
HYBRID GEOTECHNOLOGY: RESOURCE-SAVING AND ENERGY EFFICIENCY
Название Substantiation of exposure flowsheets and mining direction in reconstruction of building stone quarries
DOI 10.17580/gzh.2018.01.04
Автор Gavrishev S. E., Burmistrov K. V., Zalyadnov V. Yu., Mikhailova G. V.
Информация об авторе

Mining Engineering and Transport Institute, Nosov Magnitogorsk State Technical University, Magnitogorsk, Russia:

S. E. Gavrishev, Director, Doctor of Engineering Sciences, ormpi-cg@mail.ru
K. V. Burmistrov, Associate Professor, Candidate of Engineering Sciences
V. Yu. Zalyadnov, Associate Professor, Candidate of Engineering Sciences
G. V. Mikhailova, Assistant

Реферат

The article discusses determination of an optimal flowsheet to expose a building stone deposit from the viewpoint of minimization of stripping and production cost. The studies are carried out in terms of Krutorozhino deposit developed by Orsk Open Pit Mine Management in the Orenburg Region. Due to the complication of work at deeper levels in the operating quarry, the senior officials have made the decision to undertake feasibility study on the new North-Krutorozhino site. This area adjoins the north-eastern pitwall of the operating quarry within a single open-pit field. Selection of an optimal flowsheet to expose reserves was complicated by a number of constraints: the insufficient capacity of the current overburden dump and its workability only within the first three years of operation of the new site, as well as the requirement to employ the available equipment, supply lines and infrastructure. The scope of modeling of potential exposure flowsheets covered three basic variants divided into subvariants later on with respect to different directions of mining front advance, arrangement of haulage roads and, as a consequence, different expenditures. In order to resemble the real project conditions, it was decided to increase the annual production output from 500 thou t in the first year to 1000 thou t in the later years. A priority variant was selected based on the cost-performance ratios calculated by consolidated work data on analogous quarries. The time factor was included by discounting all money flows at a rate equal to the average inflation rate in the last 10 years in Russia. The calculations showed that the most profitable variant for building stone quarries was the flowsheet with the shortest haulage distance. The stripping ratio had the lower infl uence on the cost/performance ratio than the haulage distance.

Ключевые слова Building stone, exposure, reconstruction, flowsheet, mining advance, stage, development, stripping, dump, efficiency
Библиографический список

1. Cheban A. Yu., Sekisov G. V., Khrunina N. P. Prospects for the development of the far east region and effective development of construction rocks. Gornyy informatsionno-analiticheskiy byulleten. 2016. Special issue No. 21. Problems of complex mastering of georesources. pp. 537–546.
2. Zhmurova T. M., Medvedeva S. A. Condition evaluation and development perspectives of aggregates production in Russia and Irkutsk region. Izvestiya vuzov. Investitsii. Stroitelstvo. Nedvizhimost. 2016. No. 1. pp. 96–105.

3. Latypov D. V. Status, problems and prospects of development of mining enterprises of building materials industry. Gornyy informatsionno-analiticheskiy byulleten. 2016. No. 12. pp. 51–60.
4. Shuloyakov A. D. About Production of High-Quality Cubiform Crushed Stone. Stroitelnye materialy. 2017. No. 7. pp. 56–59.
5. Osintsev N. A. Safety of transport and technological processes of open-cast mining. Magnitogorsk : Izdatelstvo Magnitogorskogo gosudarstvennogo tekhnicheskogo universiteta, 2010. 115 p.
6. Argimbaev K. R., Yakubovskiy M. M., Ivanova M. A. Design Justification of Drainage and Anti Filter Facilities of the Tailings at Various Methods of their Constructions. International Journal of Ecology and Development. 2015. Vol. 30, Iss. 2. pp. 76–85.
7. Yakubovskiy M. M., Argimbaev K. R., Ivanova M. A. Constructions Investigation of Ore Transfer Points within Mining Limits While Developing the Deep Pit. International Journal of Ecology and Development. 2015. Vol. 30, Iss. 1. pp. 83–87.
8. de Werk M., Ozdemir B., Ragoub B., Dunbrack T., Kumral M. Cost analysis of material handling systems in open pit mining: Case study on an iron ore pre-feasibility study. The Engineering Economist. 2016. Vol. 62, No. 4. pp. 369–386.
9. Silva F. J. S., Viana H. R. G., Queiroz A. N. A. Availability forecast of mining equipment. Journal of Quality in Maintenance Engineering. 2016. Vol. 22, Iss. 4. pp. 418–432.
10. Burmistrov K. V., Zalyadnov V. Yu., Mikhaylova G. V., Dautbaev Z. R., Krutikova A. V. Substantiation of the choice of opening and direction of rock mass transportation at North-Krutorozhinskoe diabase deposit. Urgent problems of modern science, technics and education : materials of the 75-th international scientific and practical conference. Magnitogorsk, 2017. Vol. 1. pp. 15–18.
11. Burmistrov K. V., Shakshakpaev A. N., Osintsev N. A., Burmistrova I. S. Influence of haulage bench width on technical and economic indicators of open pit. Sovremennye problemy transportnogo kompleksa Rossii. 2014. No. 5. pp. 42–45.
12. Burmistrov K. V., Kolonyuk A. A., Argimbaev K. R. The choice of equipment complexes for extraction and loading in close conditions of low horizons of open pits. Vestnik Magnitogorskogo gosudarstvennogo tekhnicheskogo universiteta imeni G. I. Nosova. 2010. No. 1. pp. 22–25.
13. Mendoza J.-M. F., Feced M., Feijoo G., Josa A., Gabarrell X. et al. Life cycle inventory analysis of granite production from cradle to gate. The International Journal of Life Cycle Assessment. 2014. Vol. 19, Iss. 1. pp. 153–165.

Language of full-text русский
Полный текст статьи Получить
Назад