ArticleName |
Analysis of Cambrian clay cutting during Saint-Petersburg subway construction |
References |
1. Dashko R. E., Aleksandrova O. Yu., Kotyukov P. V., Shidlovskaya A. V. Peculiarities of engineeringgeological conditions of Saint Petersburg. Razvitie gorodov i geotekhnicheskoe stroitelstvo. 2011. No. 1. pp. 1–47. 2. Protosenya A. G., Ogorodnikov Yu. N., Demenkov P. A., Karasev M. A., Lebedev M. O. et al. Mechanics of underground facilities. Solid models and monitoring. Saint Petersburg : SPGGU, 2011. 355 p. 3. Korshunov V. A., Kartashov Yu. M. A new technique for the determination of ultimate strength in extension of rocks. Zapiski Gornogo instituta. 2011. Vol. 190. pp. 202–206. 4. Kleinert H. New results, obtained on experimental bench “Cutting heads for selective combines”. Glück auf. 1982. No. 9. pp. 33–39. 5. Seweryn A., Łukaszewicz A. Verification of brittle fracture criteria for elements with V-shaped notches. Engineering Fracture Mechanics. 2002. Vol. 69, Iss. 13. pp. 1487–1510. 6. Drilling and Excavation Technologies for the Future. Washington : National Academy Press, 1994. 176 p. 7. Pozin E. Z., Melamed V. Z., Ton V. V. Coal destruction with stoping machines. Moscow : Nedra, 1984. 288 p. 8. Aleksandrovich L. S., Alekseevich Y. D., Igorevich S. D., Adambaevich I. G. Simulation of the Process of Destruction of The Array of Cambrian Clays By Cutters Actuating Device of Sinking Machinery In Terms of OJSC “Metrostroy”, St. Petersburg. International Journal of Applied Engineering Research. 2015. Vol. 10, No. 7. pp. 16409–16417. 9. Brett J. F., Warren T. M., Behr S. M. Bit Whirl – A New Theory of PDC Bit Failure. SPE Drilling Engineering. 1990. Vol. 5, Iss. 4. pp. 275–281. 10. Beron A. I., Kazanskiy A. S., Leybov B. M., Pozin E. Z. Coal cutting. Moscow : Gosgortekhizdat, 1962. 439 p. 11. Yungmeyster D. A. Parameter substantiation of executive bodies of tunneling systems for special mine openings of the JSC “Metrostroy” (Saint Petersburg). Mastering of mineral resources of the North: problems and solutions : proceedings of the 9-th International scientific and practical conference. Vorkuta : Izdatelstvo Vorkutinskogo gornogo instituta, 2011. Vol. 2. pp. 303–307. 12. Lavrenko S. A. Designs of mechanisms for drifting of special excavations and station tunnels (8,5 m diameter) on the basis of standard tubbing erector. Mastering of mineral resources of the North: problems and solutions : proceedings of the 11-th International scientific and practical conference. Vorkuta : Izdatelstvo Vorkutinskogo gornogo instituta, 2013. pp. 427–431. 13. Ewy R. T., Cook N. G. W. Deformation and fracture around cylindrical openings in rock. II. Initiation, growth and interaction of fractures. International Journal of Rock Mechanics and Mining Science & Geomechanics Abstracts. 1990. Vol. 27, Iss. 5. pp. 409–427. 14. Randeberg E., Ford T., Nygaard G., Eriksson M., Gressgard L. J. et al. Potentials for Cost Reduction for Geothermal Well Construction in View of Various Drilling Technologies and Automation Opportunities. Proceedings of the 37th Workshop on Geothermal Reservoir Engineering. New York : Curran Associates, 2012. Vol. 1. pp. 1518–1536. 15. Huang X.-D., Zhang X.-M., Leopold J., Ding H. Analytical Model for Prediction of Residual Stress in Dynamic Orthogonal Cutting Process. Journal of Manufacturing Science and Engineering. 2018. Vol. 140, Iss. 1. pp. 1–17. 16. Chekmasov N. V., Gabov V. V., Shishlyannikov D. I., Loskutov L. A. Efficiency increase of potassium rock breaking with cutters of heading-and-winning machine executive devices. Izvestiya vuzov. Gornyy zhurnal. 2015. No. 5. pp. 43–49. 17. Buevich V. V., Chekmasov N. V., Shishlyannikov D. I., Gabov V. V. Upgrading of effectors of heading-and-winning machines “Ural”. Gornyi Zhurnal. 2016. No. 4. pp. 52–56. DOI: 10.17580/gzh.2016.04.10 18. Zhang Q.-H., Ding X.-L., Wu A.-Q. A comparison of the application of block theory and 3D blockcutting analysis. International Journal of Rock Mechanics and Mining Sciences. 2017. Vol. 99. pp. 39–49. 19. Krestovozdvizhenskiy P. D., Klishin V. I., Nikitenko S. M., Gerike P. B. Selecting Shape of Reinforcement Insertions for Tangential Swivel Cutters of Mining Machines. Fiziko-tekhnicheskie problemy razrabotki poleznykh iskopaemykh. 2014. No. 6. pp. 107–115. 20. Yao Q., Luo M., Zhang D., Wu B. Identification of cutting force coefficients in machining process considering cutter vibration. Mechanical Systems and Signal Processing. 2018. Vol. 103. pp. 39–59. 21. Verzhanskiy A. P., Yungmeyster D. A., Lavrenko S. A., Isaev A. I., Ivanov A. V. Mechanized complexes for roadway development at mines of “Metrostroy” JSC (Saint Petersburg). Gornyi Zhurnal. 2014. No. 5. pp. 94–99. |