Название |
Analysis of gearing-up devices for high-speed diamond bit drilling of long exploration holes |
Информация об авторе |
Norilsk State Industrial University, Norilsk, Russia:
Sklyanov V. I., Candidate of Engineering Sciences, Associate Professor, Head of Chair for Mineral Mining
National University of Science of Technology — MISIS, Moscow, Russia:
Eremenko V. A., Doctor of Engineering Sciences, Professor, Director of Research Center for Applied Geomechanics and Converging Mining Technologies, prof.eremenko@gmail.com
Chinakal Institute of Mining, Siberian Branch, Russian Academy of Sciences, Novosibirsk, Russia: Kondratenko A. S., Candidate of Engineering Sciences, Director Timonin V. V., Candidate of Engineering Sciences, Deputy Director |
Реферат |
In long-hole drilling the rate of penetration reduces as in this case much more energy is consumed to rotate drill strings, vibrations and oscillations of drill strings are higher, and drill pipes which often operate at rim of abilities break more frequently. All that implies that a drill string is a low-efficient transmitter of energy from drill rigs to bottomhole, especially in long-hole drilling with diamond bits. It is possible to intensify rock drilling process by placing mechanical energy generator at bottomhole. To this effect hydraulic motors and electric drills are currently available. However, hydraulic motors need high discharge pressure, while rotation speed of drill bits and drilling fluid flow rate are difficult to control and adjust. In case of electric drills, delivery of electric energy to bottomhole is complicated. All these constraints are overcome with the help of mechanical transmission represented by a bottomhole multiplying gear capable to speed-up diamond drill bits several times as against the drill string rotation. |
Библиографический список |
1. Kondratenko A. S., Timonin V. V., Patutin A. V. Prospects for directional drilling in hard rocks. Journal of Mining Science. 2016. Vol. 52. No. 1. pp. 129–134. 2. Eremenko V. A., Barnov N. G., Kondratenko A. S., Timonin V. V. Method for mining steeply dipping thin lodes. Gornyi Zhurnal. 2016. No. 12. pp. 45–50. DOI: 10.17580/gzh.2016.12.10. 3. Eremenko V. A., Eremenko A. A., Rasheva S. V., Turuntaev S. B. Blasting and the man-made seismicity in the Tashtagol mining area. Journal of Mining Science. 2009. Vol. 45. No. 5. pp. 468–474. 4. Freidin A. M., Neverov S. A., Neverov A. A., Konurin A. I. Geomechanical assessment of geotechnology at a project stage of underground ore mining. Gornyy Zhurnal. 2016. No. 2. pp. 39–45. DOI: 10.17580/gzh.2016.02.08. 5. Myaskov A. V. Methodological framework for ecologicaland-economic validation of preservation of ecosystems in mining regions. Gornyy informatsionno-analiticheskii byulleten. 2011. No. 1. pp 399–401. 6. Myaskov A. V. Urgent ecologicla-and-economic problems of subsoil use. Gornyy informatsionno-analiticheskii byulleten. 2014. No. 2. pp 157–160. 7. Galchenko Yu. P., Eremenko V. A., Myaskov A. V., Kosyreva M. A. Solution of geoecological problems in underground mining of deep iron ore deposits. Eurasian Mining. 2018. No. 2. pp. 35–40. DOI: 10.17580/em.2018.01.08. 8. Goodge J. W., Severinghaus J. P. Rapid Access Ice Drill: a new tool for exploration of the deep Antarctic ice sheets and subglacial geology. Rapid Access Ice Drill: a new tool for exploration of the deep Antarctic ice sheets and subglacial geology. Journal of Glaciology. 2016. Vol. 62. No. 236. pp. 1049–1064. 9. Makinson K., Anker P. G. D. The BAS ice-shelf hot-water drill: design, methods and tools. Annals of Glaciology. 2014. Vol. 55, No. 68. pp. 44–52. 10. Rack F. R., Duling D., Blythe D. Developing a hot-water drill system for the WISSARD project: 1. Basic drill system components and design. Annals of Glaciology. 2014. Vol. 55. No. 68. pp. 285–297. 11. Schwander J., Marending S., Stocker T. F. Radix: a minimal-resources rapid-access drilling system. Annals of Glaciology. 2014. Vol. 55. No. 68. pp. 34–38. 12. Timonin V. V., Smolentsev A. S., Shakhtorin I. O., Polushin N. I., Laptev A. I., Kushkhabiev A.S. Causes of wear of PDC bits and ways of improving their wear resistance. IOP Conference Series: Earth and Environmental Science. 2017. Vol. 53. DOI: 10.1088/1755-1315/53/1/012027. 13. Gusman M. T., Baldenko D. F., Kochnev A. M. et al. Bottomhole Propeller Engines for Drilling. Moscow : Nedra, 1981. 232 p. 14. Gusman M. T., Lyubimov B. G. et al. Design, Manufacture and Operation of Turbodrills. Moscow : Nedra, 1976. 368 p. 15. Khoreshok A. A., Mametyev L. E., Borisov A. Yu., Vorobyev A. V. The distribution of stresses and strains in the mating elements disk tools working bodies of roadheaders. IOP Conference Series: Materials Science and Engineering. 2015. Vol. 91. 012084. DOI: 10.1088/1757-899X/91/1/012084. 16. Frolov K. V., Popov S. A., Musatov A. K. Theory of Mechanisms and Mechanics of Machines. 2nd Edition. Moscow : Vysshaya shkola, 1998. 496 p. 17. Yarema V. D., Klimov Yu. I., Atamanov V. F. Mine trials of a model shearer with a diamond drill drum and a hydraulic separator. Improvement of Methods and Means of Fully Mechanized Longwalling. Karaganda, 1972. pp. 148–150. 18. Sklyanov V. I. Bottom hole intensifier as a facility for highfrequency diamond drilling of deep prospecting wells. Razvedka i okhrana nedr. 2013. No. 5. pp. 53–56. 19. C. Walton Musser. Patent No. 2906143 USA, HD 47. Strain Wave Gearing. USA. 20. Ivanov M. N. et al. Wave Gears. Engineering Design Instructions. Moscow : VNIITEMR, p. 1986. 21. Shuvalov S. A. Guidelines on Computer-Aided Design of Wave Tooth Gears, Moscow: Bauman MVTU, p. 1987. 22. Gileta V. P., Baris A. V. The profiling of the teeth of the harmonic drive. Proceedings of the Russian Higher School Academy of Sciences. 2013. No. 1 (20). pp. 80–86. 23. Sklyanov V. I., Ufatova Z. G. Sinusoidal-ball rotary-multiplying drill — a fundamentally new design to increase deep exploration drilling speed with diamond rockbreaking tool. Gornyy informatsionno-analiticheskii byulleten. 2018. No. 3. pp. 129–135. |