Название Improvement of blasting technology in sublevel caving in the Khibiny mines
DOI 10.17580/gzh.2019.11.12
Автор Kozyrev S. A., Abrashitov A. Yu., Onuprienko V. S., Volkov A. V.
Информация об авторе

Mining Institute, Kola Science Center, Russian Academy of Sciences, Apatity, Russia:

S. A. Kozyrev, Head of Laboratory, Doctor of Engineering Sciences, skozirev@goi.kolasc.net.ru

 

Kirovsk Branch Apatit, Kirovsk, Russia:
A. Yu. Abrashitov, Director
V. S. Onuprienko, Chief Engineer
A. V. Volkov, Head of Drilling-and-Blasting Department

Реферат

The paper reveals the main factors affecting the quality of ore fragmentation in underground mines of the Kola Peninsula, and suggests engineering solutions to improve efficiency of blasting in sublevel caving method using emulsion explosives. Based on the revealed patterns of emulsion matrix gasification, the optimum detonation characteristics of the emulsion explosives, as well as charging, initiation and blasting parameters were determined. The actual energy characteristics were evaluated for Sabtek explosive in various diameter boreholes, and, thereupon, blasting patterns were designed for different types of ores and rocks of the Khibiny Massif. It is shown that according to the conditions of borehole damage under explosive impact, deviation in drilling, and charging conditions, the borehole depth should be no more than 20–25 m. This allowed justification of the blasting perimeter and drilling pattern for rhomb-shaped excavation panels in underground mines of the Kirovsk Branch Apatit. It is shown that electronic drilling charts allow shorter preparation period, more accurate drilling path as compared to manual drilling and reduced probability of damage to boreholes under blasting. The optimal delay interval has been substantiated theoretically for nonsimultaneous blasting of boreholes in a fan. It has been established that the maximum breaking of rocks between boreholes occurs when the blasting delay is 15 ms. The effectiveness of the optimal delay intervals was estimated based on the fragmentation quality and blast-induced load of nonsimultaneous blasting at delay intervals of 10, 15 and 20 ms in the Rasvumchorr mine. It is shown that with 20 ms delay interval, the distinct periods are observed between blasts as compared with delay intervals of 10 and 15 ms. Furthermore, the seismic-induced load on nearby excavations reduces, and fragmentation is improved. The indicated delay interval was recommended for ore breaking in underground mines of the KB Apatit, which improved blasting safety and efficiency.

Ключевые слова Mining method, basting, explosives, drilling and blasting design, detonation velocity, charging density, blast-induced load
Библиографический список

1. Freidin A. M., Neverov A. A., Neverov S. A., Filippov P. A. Modern methods of development of the ore deposits with gash on the deep levels. Novosibirsk : Izdatelstvo SO RAN, 2008. 151 p.
2. Rusin E. P., Stazhevsky S. B. Swedish version of sublevel caving ore mining system: state-of-the-art and prospects. InterExpo Geo-Sibir. 2017. Vol. 2, No. 2. pp. 112–116.
3. Savich I. N., Mustafin V. I. Perspectives of use and rationale design solutions of block (level) and sublevel face draw. GIAB. 2015. Special issue 1. Proceedings of international scientific symposium «Miner’s Week-2015». pp. 419–429.
4. Bashkov V. I., Kopytov A. I. Calculation of parameters and constructive design options of developing sublevel caving with mechanical release of ore. Vestnik Kuzbasskogo gosudarstvennogo tekhnicheskogo universiteta. 2015. No. 2(108). pp. 75–77.
5. Petrov D. N., Neobutov G. P. Experience and prospects of sublevel caving mining of ore deposits in Yakutia. GIAB. 2017. Special issue 24. Problems of Geomechanics and Geotechnology in Mineral Mining in the North. pp. 211–219.
6. Pepelev R. G., Nesterov Yu. I. Optimization of parameters of sublevel ore drawing with diamond shape. Marksheyderiya i nedropolzovanie. 2018. No. 5(97). pp. 38–41.
7. Kozyrev S. A. Zvonar A. Yu. Increase of efficiency and safety for explosive breaking in the underground mines of the Khibiny deposits when using emulsive explosives. Vzryvnoe delo. 2011. No. 106/63. pp. 72–91.
8. Lovitt M. Evolution of sublevel caving – safety improvement through technology. The AusIMM Bulletin. 2016. April. P. 82–85.
9. Lapčević V., Torbica S. Numerical Investigation of Caved Rock Mass Friction and Fragmentation Change Influence on Gravity Flow Formation in Sublevel Caving. Minerals. 2017. Vol. 7, Iss. 4.
10. Mohanty B., Zwaan D., Malek F. Diagnostics of Production Blasts in a Deep Underground Mine. Engineering and Mining Journal. 2013. Vol. 214, No. 8. pp. 52–57.
11. Wimmer M., Nordqvist A., Righetti E., Petropoulos N., Thurley M. Analysis of Rock Fragmentation and its Effect on Gravity Flow at the Kiruna Sublevel Caving Mine. Proceedings of the 11th International Symposium on Rock Fragmentation by Blasting. Sydney, 2015. pp. 775–792.
12. Shekhar G., Gustafson A., Boeg-Jensen P., Malmgren L., Schunnesson H. Draw control strategies in sublevel caving mines – A baseline mapping of LKAB’s Malmberget and Kiirunavaara mines. The Journal of the Southern African Institute of Mining and Metallurgy. 2018. Vol. 118, Iss. 7. pp. 723–733.
13. Nordqvist A., Wimmer М. Holistic Approach to Study Gravity Flow at the Kiruna Sublevel Caving Mine. Proceedings of the 17th International Conference & Exhibition on Mass Mining. Sydney, 2016. pp. 401–414.
14. Vlasova E. A., Derzhavets A. S., Kozyrev S. A., Kutin N. G., Filchakov A. A. Explosive characteristics and gas toxicity of industrial explosives. Vzryvnoe delo. 2008. No. 99/56. pp. 119–136.
15. Artemev E. P., Tryastsin A. V. Validation of optimal delay intervals for bulk blasting in open pit mines. Izvestiya vuzov. Gornyi zhurnal. 2013. No. 2. pp. 84–87.
16. Ermolaev A. I., Tokmakov V. V., Teterev N. A., Shtrek A. S. Rock breakage mechanisms under shortdelay blasting and delay interval calculation. Innovation Mining Technologies for Metalliferous and Nonmetalliferous Deposits : III International Conference Proceedings. Ekaterinburg, 2014. pp. 75–79.
17. Kushnerov P. I., Shumskiy A. I. Optimal delay intervals between neighbor holes in short-delay blasting. Vzryvnoe delo. 2008. No. 99/56. pp. 69–79.
18. Kozyrev S. A., Kamyansky V. N., Alenichev I. A. Estimation of interaction borehole charges at different delay time between them. Vzryvnoe delo. 2017. No. 117/74. pp. 60–75.

Language of full-text русский
Полный текст статьи Получить
Назад