Журналы →  Gornyi Zhurnal →  2021 →  №10 →  Назад

FROM THE OPERATIONAL EXPERIENCE OF THE MINING COMPANIES AND THE ORGANIZATIONS
MAYAK MINE, NORNICKEL’S POLAR DIVISION
Название Empirical approach to ore pass geometry justification in Talnakh mines
DOI 10.17580/gzh.2021.10.03
Автор Marysyuk V. P., Shilenko S. Yu., Trofimov A. V., Rumyantsev A. E.
Информация об авторе

NorNickel’s Polar Division, Norilsk, Russia:

V. P. Marysyuk, Chief Geotechnical Engineer—Director of the Geodynamic Safety Center, Candidate of Engineering Sciences
S. Yu. Shilenko, Deputy Director of the Industrial and Occupational Safety Department

 

Gipronikel Institute, Saint-Petersburg, Russia:

A. V. Trofimov, Head of Geotechnical Engineering Laboratory, Candidate of Engineering Sciences, TrofimovAV@nornik.ru
A. E. Rumyantsev, Chief Specialist, Candidate of Engineering Sciences

Реферат

Ore mining in the Talnakh and Oktyabrsky fields using stoping methods includes construction and support of many temporal and permanent ore passes for ore haulage by gravity, which is the commonly known effective and cost-saving technology. Despite all benefits, there are some geotechnical complexities. For instance, making ore passes with smaller diameter increases their stability, which allows using them in difficult ground conditions, on the one hand, and, on the other hand, this can lead to frequent ore flow arching phenomena in ore passes and, consequently, to the increase in efforts for their elimination. This paper presents summary recommendations for selecting the cross-section shape and dimension of an ore pass based on global practice. The approach to determining the ore pass diameter with regard to grain sizes and properties of ore flow is substantiated. A series of experiments for determining the physical and mechanical properties (cohesion and internal friction angle) of ore mixture with a given particle size distribution at various degrees of moisture is carried out. Considering the determined properties, the minimum diameter of an ore pass to provide ore flow without formation of cohesive and interlocking arches is calculated. It is found that at the ore pass diameter of 2.4 m and at the maximum lump ore size of 254 mm, the material with natural moisture flows freely without arching in the ore pass.

Ключевые слова Ore pass, ore mixture, grain size distribution, cohesive arch, interlocking arch, free flow ratio, cross-section shape
Библиографический список

1. Hadjigeorgiou J., Lessard J. F. Strategies for restoring material flow in ore and waste pass systems. International Journal of Mining, Reclamation and Environment. 2010. Vol. 24, Iss. 3. pp. 267–282.
2. Medvedev I. F., Abramov A. V., Nefedov A. P. Elimination of arching and secondary crushing of ore. Moscow : Nedra, 1975. 197 p.
3. Skawina B., Greberg J., Salama A., Gustafson A. The effects of orepass loss on loading, hauling and dumping operations and production rates in a sublevel caving mine. The Journal of the Southern African Institute of Mining and Metallurgy. 2018. Vol. 118, Iss. 4. pp. 409–418.
4. Sergunin M. P., Darbinyan T. P., Shilenko S. Yu., Grinchuk I. P. Digital surface modeling of an ore pass to reveal orientation of principal stresses and effect of rock fracturing. Gornyi Zhurnal. 2020. No. 6. pp. 28–32. DOI: 10.17580/gzh.2020.06.04
5. Marysyuk V. P., Shilenko S. Yu., Trofimov A. V., Kuzmin S. V. Risk assessment in main ore chute construction in difficult geological conditions based on integrated geotechnical research. Gornyi Zhurnal. 2020. No. 1. pp. 62–66. DOI: 10.17580/gzh.2020.01.12
6. Hadjigeorgiou J., Lessard J. F., Mercier-Langevin F. Ore pass practice in Canadian mines. The Journal of the South African Institute of Mining and Metallurgy. 2005. Vol. 105, Iss. 11. pp. 809–816.
7. Yin Yue, Ma Chi, Lu Zengxiang, Zhang Zhiqiang. Deformation and damage of orepass wall under impact and cutting. World of Mining – Surface and Underground. 2020. Heft 4. pp. 205–210.
8. Hadjigeorgiou J., Lessard J. F. The Case for Liners in Ore Pass Systems. Proceedings of the 3rd International Seminar on Surface Support Liners. Quebec, 2003. p. 14.
9. Morrison D. M., Kazakidis V. N. Orepasses in Burst-Prone Ground: Current Practice and Alternatives. Proceedings of the 12th Mine Operators Conference. Timmins, 1995.

10. Bunker K. A., Campbell A. D., O’Toole D., Penney A. Guidelines for orepass design in a sublevel cave mine. Proceedings of the International Seminar on Design Methods in Underground Mining. Perth : Australian Centre for Geomechanics, 2015. pp. 585–600.
11. He Chen, Shibo Yu, Zhixiu Wang, Ye Yuan. A New Plugging Technology and Its Application for the Extensively Collapsed Ore Pass in the Non-Empty Condition. Energies. 2018. Vol. 11, Iss. 6. 1599. DOI: 10.3390/en11061599
12. Ye Yuan, Dengpan Qiao, Shibo Yu. Plugging and Its Stability Evaluation for the Ore Pass in the Nonempty Condition Based on Controllable Grouting of Cement-Sodium Silicate Grout. Geofluids. 2021.Vol. 2021. ID 6666297. DOI: 10.1155/2021/6666297
13. Kvapil R. Theorie der Schüttgutbewegung Auslaufverhalten von Schüttgütern in Bunkern. Berlin : Verlag Technik, 1959. 83 s.
14. Turtygina N. A. Simulation of intermixing in ore drawing process. GIAB. 2021. No. 1. pp. 146–159.
15. Ermakova I. A. Width of ore flow in process of ore drawing from working face for systems with caving ores and containing breeds. Vestnik Kuzbasskogo gosudarstvennogo tekhnicheskogo universiteta. 2018. No. 3(127). pp. 44–50.
16. De La Vergne J. N. Hard Rock Miner’s Handbook. 5th ed. Edmonton : Stantec Consulting Ltd., 2008. 314 p.
17. Koivisto M. Ore Pass Design and Placement : Master’s Thesis European Mining, Minerals and Environmental Program. Delft, 2017. 105 p.
18. Kokoev S. G., Yusupov G. A., Feoktistov A. Yu., Trofimov A. V., Rumyantsev A. E. et al. Substantiation of the main ore pass parameters based on discrete-element modeling. GIAB. 2019. Special issue 37. Digital technologies in mining. pp. 158–167.
19. Marysyuk V. P., Ryshkel I. A., Trofimov A. V., Kirkin A. P. Analysis of grain size distribution in broken rock mass in the Oktyabrsky Mine. Gornyi Zhurnal. 2019. No. 11. pp. 24–28. DOI: 10.17580/gzh.2019.11.03
20. Hambley D. F. Design of ore pass systems for underground mines. CIM Bulletin. 1987. Vol. 80, No. 897. pp. 25–30.

Language of full-text русский
Полный текст статьи Получить
Назад