DESIGN AND RENOVATION OF PROCESSING PLANTS | |
Название | Reconstruction project for thickening and circulating water supply system at Lebedinsky GOK JSC |
DOI | 10.17580/gzh.2023.10.09 |
Автор | Golovanov A. V., Ropeiko S. A., Ismagilov R. I., Golenkov D. N. |
Информация об авторе | RIVS Group, Saint-Petersburg, Russia A. V. Golovanov, Deputy Director of Design Works Department, Candidate of Engineering Sciences, golovanov_a@list.ru
METALLOINVEST Management Company LLC, Moscow, Russia |
Реферат | The project documentation was developed for the reconstruction of the thickening and circulating water supply system of Lebedinsky GOK JSC. The project provides reconstruction of the thickening and circulating water supply unit at the tailings facilities of the local concentrating plant, with a view to increasing the solid content of the tailings pulp after thickening from 23 to 50–60 % and to ensuring process (circulating) water supply to the technological process. The design decisions took into account the main provisions of the development concept of Lebedinsky GOK, as well as the results and inferences obtained in elaboration of the production procedures for processing iron ore raw materials. The design solutions were developed with regard to the optimal economic indicators of introduction of the thickening technology and included the following main objects: 8 thickeners Ø50 m; 8 thickeners Ø100 m; flocculant preparation housing; circulating water pumping station No. 3. |
Ключевые слова | Lebedinsky GOK, tailings thickening technology, design and working documentation, iron ore raw materials, tailings storage, circulating water supply |
Библиографический список | 1. Pote N. S. Waste water treatment and management techniques in mines. International Journal of Engineering Sciences & Research Technology. 2017. Vol. 6(4). pp. 178–191. |
Language of full-text | русский |
Полный текст статьи | Получить |