Journals →  Gornyi Zhurnal →  2011 →  #2 →  Back

DEVELOPMENT OF DEPOSITS
ArticleName The experience of volume and form definition of excavated breast during down hole hydro-extraction
ArticleAuthor Nitsevich O. A., Tsurlo E. N., Yanushenko A. P.
ArticleAuthorData O. A. Nitsevich, General Director, «Siberian Industrial Holding», phone: (343) 234-63-34; E. N. Tsurlo, Director, Quartz Group Limited Compan, phone: (381-71) 2-65-71; A. P. Yanushenko, Chief Engineer, «Siberian Industrial Holding», phone: (343) 234-63-34.
Abstract
The long-term experience of elaboration of Tarsky zircon-ilmenite deposit via method of down hole hydro-extraction has been presented. The results of experiments and researches of forming process of excavated down hole have been conduced. Pilot-industrial works confirm the actuality and efficiency of down hole hydro-extraction method and define a lot of questions, demanding further researching.
keywords Down hole hydro-extraction, zircon-ilmenite deposit, excavated breast, hydromonitorial cutting.
Language of full-text russian
Full content Buy
Back