Журналы →  Gornyi Zhurnal →  2011 →  №6 →  Назад

MINING AND CONCENTRATING COMPLEX
Название Mineral-raw materials base and prospects of development iron-ore quarry at “Stoilenskiy Mining and Concentrating Plant” joint stock company
Автор Kryuchkov A. V., Semenov V. V., Rybakov V. P., Kompaniets A. I., Seryi S. S.
Информация об авторе

A. V. Kryuchkov, Chief Engineer — Deputy General Director, e-mail: Kryuchkov_AV@sgok.ru; V. V. Semenov, Deputy Chief Engineer for blasting — Head of Technical Department, Candidate of Engineering Sciences, e-mail: Semenov_VV@sgok.ru; V. P. Rybakov, Chief Surveyor, e-mail: Rybakov_VP@sgok.ru, "Stoilenskiy Mining and Concentrating Plant" Company; A. I. Kompaniez, Chief Engineer, e-mail: cgr@belgtts.ru, "Tsentrogiproruda" Company; S. S. Seryi, Deputy Director forResearch Work, Candidate of Engineering Sciences, e-mail: viogem@mail.belgorod.ru, Federal State Unitary Enterprise, All-Russian Research Institute of Drainage of a Mineral Resources Deposit, Engineering Constructions Protection from Flood, Special Mining Works, Geomechanics, Geophysics, Hydrotechnics, Geology and Mine Surveying.

Реферат

The prospects of productivity increasing of Stoilenskiy Mining and Concentrating Plant quarry by the way of widening (owing to reclamation of the South deposit) and processing of depth levels have been analyzed. There are three versions of improvement of transport system of extracted ores delivery from quarry to benefication plant, such as railway, conveying and combined systems. The combined scheme is more preferential according to preliminary calculation.

Ключевые слова “Stoilenskiy Mining and Concentrating Plant” joint stock company, quarry, productivity, system of ore tranportation
Language of full-text русский
Полный текст статьи Получить
Назад