Journals →
Gornyi Zhurnal →
2009 →
#10 →
Back
Back
THE EQUIPMENT AND MATERIALS | |
ArticleName | Optimisation of rotor equipment and periodicity of replacement of the cutting tool at shield drivage of tunnel and other mine excavation |
ArticleAuthor | Mazein S. V. |
Abstract | Techniques and grapho-analytical dependence of optimization of rotor equipping and periodicity of replacement of the cutting tool of board complexes are presented. It is developed on the basis of researches and the analysis of the statistical data of building of large tunnels in Moscow. |
keywords | Transport tunnels, board complexes, rotor equipping, cutters, bush roll, scoops, wear of the cutting tool, system «ground – cutter», interval of replacement of cutters |
Language of full-text | russian |
Full content | Buy |