Journals →  Gornyi Zhurnal →  2009 →  #10 →  Back

THE EQUIPMENT AND MATERIALS
ArticleName Optimisation of rotor equipment and periodicity of replacement of the cutting tool at shield drivage of tunnel and other mine excavation
ArticleAuthor Mazein S. V.
Abstract

Techniques and grapho-analytical dependence of optimization of rotor equipping and periodicity of replacement of the cutting tool of board complexes are presented. It is developed on the basis of researches and the analysis of the statistical data of building of large tunnels in Moscow.

keywords Transport tunnels, board complexes, rotor equipping, cutters, bush roll, scoops, wear of the cutting tool, system «ground – cutter», interval of replacement of cutters
Language of full-text russian
Full content Buy
Back