Журналы →  Gornyi Zhurnal →  2011 →  №8 →  Назад

ABOUT EXPERIENCE OF MINING ENTERPRISES AND ORGANIZATIONS WORKS
Improvement of techniques and technologies of mining works
Название Development and implementation of mining plants at uranium in-situ leaching facilities
Автор Shemetov P. A., Glotov G. N.
Информация об авторе Shemetov P. A., Adviser of General Director, Doctor of Engineering Sciences, e-mail: info@ngmk.uz; Glotov G. N., Deputy General Director, Candidate of Engineering Sciences (Navoi Mining and Metallurgical Combinat), e-mail: gnglotov@yandex.ru
Реферат

On the base of educed regularities the determination (causativeconsecutive), dynamical (described in time) model of uranium underground leaching, adopted (checked) as conformity to fact results of technological blocks (cells) tests. Efficiency is high (since 90%). The techniques of correction coefficients determination (adoption to different conditions) have been developed for model usage in different conditions of underground leaching (Russia, Kazakhstan, Ukraine, China and etc.).

Ключевые слова Plan of mining works, enterprises of underground uranium leaching, mathematical simulation, industry design, geotechnological model.
Language of full-text русский
Полный текст статьи Получить
Назад