TECHNICAL AND TECHNOLOGICAL ASPECTS OF DEVELOPMENT KIMBERLITE DEPOSITS | |
ArticleName | Substantiation of the equipment productivity at the remote control for “Udachnyy” open pit |
ArticleAuthor | Tarasov P. I., Zhuravlev A. G., Cherepanov V. A., Akishev A. N., Shubin G. V. |
ArticleAuthorData | Institute of Mining, Ural Department of Russian Academy of Sciences (Ekaterinburg, Russia): Tarasov P. I., Divisional Manager, Candidate of Engineering Sciences, e-mail: tp6005@r66.ru Zhuravlev A. G., Senior Researcher, Candidate of Engineering Sciences, e-mail: artjurav@yandex.ru Cherepanov V. A., Junior Researcher, e-mail: vladandmir@list.ru «Yakutniproalmaz» Institute (Mirnyy, Russia): Akishev A. N., Head of Department, Candidate of Engineering Sciences, e-mail: AkishevAN@alrosa.ru
North-Eastern Federal University named after M. K. Ammosov (Yakutsk, Russia): Shubin G. V., Head of a Chair, Candidate of Engineering Sciences, e-mail: grigshubin@mail.ru |
Abstract | With the improvement of ore pillars in the “Udachnyy” open pit of “ALROSA” JSC, there is planned to use a unique technology with the edges placing into the limit stability position, due to the ultra-high benches and rock mass haulage, by the steeply inclined ramps. The rock mass from the pillars is going to be blown up and dropped to the open pit’s bottom for the formation of ore-rock cushion, required for the transition to the process of the underground mining of deposit. However, part of the ore is going to be extracted from the breakdown by open-cast mining. In order to ensure the safe working conditions of operators, there is going to be used the complex of loading and haulage equipment with the remote control. This equipment consist of a loader and hinged dump trucks. Taking into account the absence of experience in the application of mobile equipment with a remote control at Russian enterprises, the substantiation of the equipment productivity became the important task. This paper considers the certain variants, when the ore hauling period will take one year or half of a year. In this case, considering the dump trucks fleet, there are many variation parameters, such as: |
keywords | Deep open pit, transfer to the underground mining, nearbottom reserves, ore pilars, vertical bank slopes, dangerous environment, remote control, equipment productivity, terms of improvement |
References | 1. Juliana Parreira, John Meech. Autonomous vs manual haulage trucks - how mine simulation contributes to future haulage system developments. Available at: http://www.infomine.com/library/publications/docs/parreira2010.pdf |
Language of full-text | russian |
Full content | Buy |